Irvine Cove Lift Station Generator.
Client
City of Laguna Beach, California (state funded)
Project Location
Laugna beach ,California
Project Type
Design-Bid-Build.
Project Status
in progress (85% completed)
Total Contract Value
$660,340
Project Description: In general the work includes install a new subgrade pre-case concrete vault, hosing a South Coast Air Quality Management District Certified Internal Combustion Engine Emergency Standby Natural Gas Generator Set and its associated accessories and appurtenance (ATS, Genset control panels, generator radiator exhaust shroud, engine exhaust, silencers, natural gas feed and meter equipment, vault power and control wiring and conductors and panels, nuisance flow pumps, vault ventilation, access larders and hatches, etc.)